Case studies / A few projects in detail
Selected projects — constraints, decisions, results.

A project basis that travelled
One modular engineering basis, adapted across four facilities.
The case studies below explain the engineering decision behind each deliverable: the constraint, the role and the project-stage result.
Open the field case study-
2023
Read
Wellpad Production Facility
FEED package, including a Class 2 cost estimate, prepared for execution tender without rebuilding the existing CPF.
-
2022–2023
Read
Hydrogen-from-Reservoir Concept with CO2 Capture
Concept and Class 5 cost basis established for the client's next development decision.
-
2021
Read
Automated Modular Seawater Injection Unit
HAZOP recommendations incorporated before FAT, installation and offshore commissioning.
-
2020
Read
100,000 BPD Seawater Injection Topside
Basic engineering converted into a vendor-ready RFQ and bid-evaluation package.
-
2013–2015
Read
Modular EPFs for Extra-Heavy Crude
A repeatable modular basis delivered across four facilities through installation and commissioning.